- Created a google doc containing a parts list and a to-do list for each part. Shared it with all of you so you should be able to edit the document. Look at it and see if I missed out anything.
- Base plate holes are off, look at updated CAD uploaded on CTools.
Lots of things to do before the design expo! We need to keep working hard.
Tuesday, November 13, 2012
Wednesday, November 7, 2012
To do before MS7
1) Change size of bolts in CAD to #6 screws
2) Finalize motor-gearbox combination (calculate expected speed of vehicle)
3) Finalize mechanism and design of pole arm
4) Figure out how to attach shaft on to wheels
2) Finalize motor-gearbox combination (calculate expected speed of vehicle)
3) Finalize mechanism and design of pole arm
4) Figure out how to attach shaft on to wheels
Sunday, October 28, 2012
Strategy and Machine Concept
Strategy and Machine Concept
If opponent are trying to collect red or yellow balls to be deposited at their goal, then we will place our machine on top of their goal to prevent them scoring. Depending on the situation, we also considered "stopping by" the tower perches to collect one of the black ball (step 5) to play "the swap" tactics.
If opponent are trying to collect the black balls, then we will just stay at our goal to prevent them from depositing the balls at our end.
To reach this objective, we designed our machine to have three important features:
1. Extending arm to reach the tower perches
2. High speed and maneuverability by having independently driven wheels.
3. Wide base and two rollers to prevent the machine falling into the hole.
Below are the screenshot of our "Solidworks" machine design concept:
Thursday, October 25, 2012
Team Schedule
Here's the team schedule, which includes the tasks we have to do, the due date and the person(s) responsible for each task.
http://goo.gl/Z4RKw
http://goo.gl/Z4RKw
Subscribe to:
Posts (Atom)



